Trusted by over 200 clients in 30+ countries

SEDRA Project in Riyadh

Detailed image of a black pencil resting on architectural blueprints, ideal for design and planning themes.
SEDRA Project in Riyadh: 20,000 m² Steel Structure Factory Completed in 45 Days of Installation
Yinong Steel Structure is currently executing a massive project in the heart of Riyadh, Saudi Arabia. Known as the “SEDRA Project,” it is a 20,000 m² steel structure factory specifically designed to withstand the harsh Saudi desert climate.
Location & Challenges
The project is located in Riyadh, where steel structures face unique challenges:
  • Extreme heat reaching 50°C in summer
  • Frequent sandstorms
  • Temperature fluctuations between day and night
This requires specialized engineering with dust-sealed joints and heat-reflective panels.
weixin image 20260513083545
Yinong Solutions
The Yinong team worked with local contractors in Riyadh to deliver a steel structure that meets project requirements and Saudi building codes.
Key Specifications:
  • Area: 20,000 m² of industrial space
  • Structure: High-quality steel frames optimized for desert conditions
  • Resistance: Hot-dip galvanizing for corrosion protection against harsh weather
Speed of Execution
Production: 30 days at Yinong factories in Shanghai & Zhejiang
Shipping: 20-40 days by sea to Jeddah
Installation: 45 days at Riyadh site
Total: Less than 4 months
 
This timeline proves that prefab steel construction is much faster than traditional concrete, which could take a year or more.
weixin image 20260513083549
Why Yinong?
  • 32+ years of experience
  • 4 factories in China and Cambodia
  • 39 countries exported to
  • 325 successful projects worldwide
Yinong Steel Structure specializes in building factories and industrial facilities.
Interested in a similar project? Contact us — we reply within 2 hours!

Leave a Reply

Your email address will not be published. Required fields are marked *

send your inquiry

Leave Your Message
Message
(optional) file upload