Mexico

A 12,000 m² steel structure plant was successfully delivered in Mexico, utilizing a total of 450,000 tons of steel, with operations scheduled to begin in 2026.

A 12,000 m² steel structure plant was successfully delivered in Mexico, utilizing a total of 450,000 tons of steel, with operations scheduled to begin in 2026.