Project Case

Hangzhou Commercial Complex

Commercial complex project for retail, dining, hotel functions and public-facing building use.

Project CategoryCommercial
Project TypeShopping Mall
RegionAsia
Source PageProject Cases
Hangzhou Commercial Complex

Case Overview

Built project reference for quotation discussion.

Commercial complex project for retail, dining, hotel functions and public-facing building use. The case is kept in the Project Cases system and connected to the commercial project route so visitors can continue from project proof to structure selection and inquiry.

Open Commercial Building Solution

Project Logic

From built case to project quotation.

Each project detail page keeps the original case information and uses the Commercial, Industrial or Residential project route for inquiry.

01

Confirm use case

Building purpose, span, local conditions and target delivery schedule define the first quotation direction.

02

Review steel system

Main frame, enclosure, mezzanine, roof and accessory needs are matched with project requirements.

03

Prepare inquiry

Drawings, site information and preferred specification can be sent to Yinong for a structured quotation response.

Original Project Detail

Existing case information is retained below.

The previous project content remains available here, but the page now uses the unified new website navigation and contact behavior.

screenshot

Table of Content

1. Brief Introduction

2. Detailed Information

3. Image Gallary

4. Project Video

Brief Introduction

• Location: Hangzhou City, Zhejiang Province, China
• Field: Commercial Complex / Urban Infrastructure
• Total Area: 14,148 m²
• Steel Structure Weight: Approx. 2,100 tons
• Building Height: 6 floors
• Floor Area Ratio: 1.9
• Functional Zones: Retail, F&B, hotel (71 rooms), control room, property management office, equipment rooms and parking areas
• Special Feature: Integrated metro entrance and ventilation shafts
• Scope of Work: Steel structure system supply
• Steel structure delivery time: 20 days
• Scheduled operation: 2026

Detailed Information

This project is currently under construction and adopts a six-story steel structure system with a total steel volume of approximately 2,100 tons across a 14,148 m² footprint. The building integrates commercial, hospitality, and infrastructure functions, including a 71-room hotel and an embedded metro entrance, while achieving a FAR of 1.9 through efficient spatial planning. Our rapid 20-day steel structure delivery has significantly accelerated the construction schedule and meets strict International Standards for safety, durability, and performance, highlighting our strength in complex urban, export-oriented projects.

screenshot
screenshot
img 6629
img 6615
img 6596
img 6587
default

Project Video

https://youtu.be/I0lIjJdvfeI?si=5I15Btpvm8d7YDBL

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

More Projects

default

Kazakhstan Capsule House

Asian Market,Tiny Resort With extensive experience in high-altitude and cold-climate Tiny Resort projects, every design decision—from unit selection to floor heating installation—was guided by best practices in alpine construction. This approach ensures the resort achieves optimal comfort, aesthetic appeal, and operational… Read More luban cabin

Australia Capsule House

Australia,Tiny Resort 2025 12 18 181000

Brazil Capsule House

South American Market,Tiny Resort t series

Saudi Arabia Capsule House

Middle East,Tiny Resort floating fh30

German Capsule House

European Market,Tiny Resort capsule k30

Spain Capsule House

European Market,Tiny Resort img 3619

London Capsule House

European Market,Tiny Resort

Ready to Build with Us?

Don’t hesitate to book your discovery call with me today!

Book A Call Now

send your inquiry

Leave Your Message
Message
(optional) file upload