Project Case

Henghong New Materials Plant

Located in Tongxiang, Zhejiang, this branch manufacturing facility uses a partially two-story steel structure with integrated mezzanine levels.

Project CategoryIndustrial
Project TypeFactory / Workshop
RegionAsia
Source PageProject Cases
Henghong New Materials Plant

Case Overview

Built project reference for quotation discussion.

Located in Tongxiang, Zhejiang, this branch manufacturing facility uses a partially two-story steel structure with integrated mezzanine levels. The case is kept in the Project Cases system and connected to the industrial project route so visitors can continue from project proof to structure selection and inquiry.

Open Industrial Building Solution

Project Logic

From built case to project quotation.

Each project detail page keeps the original case information and uses the Commercial, Industrial or Residential project route for inquiry.

01

Confirm use case

Building purpose, span, local conditions and target delivery schedule define the first quotation direction.

02

Review steel system

Main frame, enclosure, mezzanine, roof and accessory needs are matched with project requirements.

03

Prepare inquiry

Drawings, site information and preferred specification can be sent to Yinong for a structured quotation response.

Original Project Detail

Existing case information is retained below.

The previous project content remains available here, but the page now uses the unified new website navigation and contact behavior.

default

Table of Content

1. Brief Introduction

2. Detailed Information

3. Image Gallary

4. Project Video

Brief Introduction

  • Location: Tongxiang City, Zhejiang Province, China
  • Field: New Materials Manufacturing (Export-oriented Project)
  • Area: 12,874 m²
  • Building Type: Steel structure branch plant with partial two floors and mezzanine
  • Load Requirements: 5 tanks (≈8 tons each, including contents)
  • Scope of Work: Steel structure design, fabrication and supply
  • Steel structure delivery time: 1 month
  • Scheduled operation: 2026

Detailed Information

The building incorporates a partially two-story steel framework with mezzanine levels engineered to accommodate key production equipment and five storage tanks, each with an approximate total weight of eight tons. To meet stringent cleanliness and environmental control requirements, both the walls and roof are constructed using high-performance double-layer panels. In order to ensure a stable and enhanced anti-slip coefficient, a specialized surface treatment process was applied, improving both operational safety and long-term durability. Completed within a highly efficient one-month delivery cycle, this project exemplifies our capability to execute fast-track, high-standard steel structure solutions in full compliance with International Standards, supporting advanced manufacturing operations .

default
default
default
default
default
default

Project Video

https://youtu.be/WT4w8yzLXZU?si=yIbyeef3YSApaRuP

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

More Projects

default

Kazakhstan Capsule House

Asian Market,Tiny Resort With extensive experience in high-altitude and cold-climate Tiny Resort projects, every design decision—from unit selection to floor heating installation—was guided by best practices in alpine construction. This approach ensures the resort achieves optimal comfort, aesthetic appeal, and operational… Read More luban cabin

Australia Capsule House

Australia,Tiny Resort 2025 12 18 181000

Brazil Capsule House

South American Market,Tiny Resort t series

Saudi Arabia Capsule House

Middle East,Tiny Resort floating fh30

German Capsule House

European Market,Tiny Resort capsule k30

Spain Capsule House

European Market,Tiny Resort img 3619

London Capsule House

European Market,Tiny Resort

Ready to Build with Us?

Don’t hesitate to book your discovery call with me today!

Book A Call Now

send your inquiry

Leave Your Message
Message
(optional) file upload