Yingfeng Industrial Plant

Located in Nanhu District, Jiaxing, this 37,632 m² export-oriented industrial park comprises 12 large-span steel-structure workshops with a total steel consumption of approximately 3,000 tons. The project was completed within a two-month timeframe, delivering flexible, open interior spaces through an optimized portal frame system, perfectly aligned with the client’s future leasing and operational requirements.

Brief Introduction

  • Location: Jiaxing City, Zhejiang Province, China
  • Field: Export-oriented Industrial Manufacturing
  • Total Area: 37,632 m² (each 3,136 m²)
  • Structure: 12 steel structure factory buildings
  • Steel Consumption: Approx. 3,000 tons
  • Structural System: Large-span rigid frame system
  • Project Duration: 2 months
  • Scope of Work: Steel structure design, fabrication and installation

Detailed Information

Utilizing an optimized large-span portal rigid frame system, the project achieved an expansive and highly flexible internal layout while maintaining strict cost control. With a total steel consumption of approximately 3,000 tons, the development demonstrates an efficient balance between structural performance and economic feasibility. Completed within an accelerated two-month construction cycle, the project highlights our company’s core strengths in rapid delivery, integrated resource coordination, and comprehensive steel structure solutions, while fully supporting the client’s future leasing, expansion, and diversified operational needs.

Project Video

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

More Projects

How Fast Can a Resort Be Built with Modular Capsule Houses?

Traditional Construction Timeline A common small resort construction project using conventional techniques requires: 10-18 month time frame Construction in sequence (foundation → structure → finishing)High dependence on manpower and climatic conditionsConstruction delays resulting from coordinating...

Ready to Build with Us?

Don't hesitate to book your discovery call with me today!

Leave a Reply

Your email address will not be published. Required fields are marked *

send your inquiry

Leave Your Message
Message
(optional) file upload