RuiZhe Logistics

Located in Jiashan, Zhejiang, a 50,482 m² multi-story steel structure logistics complex with three buildings and an integrated second-floor connection platform; steel system delivered in two months.

Brief Introduction

  • Location: Jiashan, Zhejiang Province, China
  • Field: Logistics & Warehousing Infrastructure
  • Area: 50,482 m²
  • Sustainability: High-strength, energy-efficient steel system
  • Scope of work: Complete steel structure system supply for three multi-story buildings and connecting platform
  • Steel structure delivery time: 2 months
  • Operation commencement: 2026

Detailed Information

Developed for Ruizhe Logistics, a large-scale logistics enterprise serving the highly active Yangtze River Delta region. This export-oriented, international-standard project consists of three multi-story warehouse buildings, with an intelligently designed connecting platform between Buildings 1 and 2 on the second floor to enhance internal circulation and expand storage capacity. As the steel structure supplier, we delivered a robust, high-performance structural system engineered for exceptional load-bearing capacity, structural stability, and long-term durability. The corrosion-resistant, precision-fabricated steel components were installed through an optimized, fast-track construction process, completing delivery within two months and significantly accelerating the client’s development schedule. Executed in line with international standards and Sustainability & ESG principles, the project demonstrates outstanding safety, efficiency, and resilience, providing a future-proof facility for large-scale logistics and warehousing operations.

Project Video

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.

More Projects

How Fast Can a Resort Be Built with Modular Capsule Houses?

Traditional Construction Timeline A common small resort construction project using conventional techniques requires: 10-18 month time frame Construction in sequence (foundation → structure → finishing)High dependence on manpower and climatic conditionsConstruction delays resulting from coordinating...

Ready to Build with Us?

Don't hesitate to book your discovery call with me today!